Welcome to the official website of the positive-Tek Set Home | Favorite | Chinese | English
Service Hotline:400-656-2815
News
Empfohlene Product
ytjc
beijiao
Hot News
Waterproof construction 8 minutes poisoning [12-08]
Eliminate products still have a market [12-08]
Construction technology of waterproof layer of cement mortar [12-08]
Waterproof coating engineering design principles [12-08]
Address: Shenzhen City Nanshan Pine Hill Industrial Zone Fifth
Telephone: 0755-85214337
Contact: Mr. Liu (Manager)
Cell phone: 13670231456
URL: www.jkheibao.com
Mailbox: jkheibao@126.com
Zip code: 518000
Company News Your location: Home > Company News
Construction points of JS composite waterproof coating
Update Time:2016-12-08 View : 8552
Construction points of JS composite waterproof coating:
The basic treatment of primary surface should be smooth, solid, without sharp corners, dust and water, and good waterproof node processing according to the design requirements. The oil must be clean, low breakage hsiuping.
Ingredient: according to the proportion of liquid material, powder and water which are marked on the product packaging. The filling amount of water can be adjusted properly to adjust the viscosity of paint, and to meet the construction requirements of different parts of the surface and the plane.
Paint with the method for the first liquid and water into the mixing barrel, in a hand blender constantly stirring will be added to the powder slowly added, at least 5 minutes of stirring, stirring evenly, a slurry without clumps.
Details: additional waterproof layer according to the design requirements in the design are embedded in fill sealing material, in the corner, root canal should detail many times (2-4 times) with JSA-101, the underground engineering should be laying a layer of reinforced material matrix clamp.
Large waterproof layer construction - waterproof coating should be more than coating, should be completed at least four times, each time the coating time is generally 8h, the winter should be extended. Each time the film thickness at 0.4 ~ 0.5mm is appropriate, it should not be too thick, with the facade construction without adding water or water is appropriate, in order to avoid paint flow, resulting in elevation of the thickness is not easy to reach the design thickness, which leads to the yin-yang angle of stacked too thick, crack. Overlay the carcass reinforcing material, the matrix should be smooth, wrinkle free repair company - Shenzhen Huasheng Company Shenzhen fold, lap of not less than 100mm, the construction of the first coating of paint, paved on top of paint.
After the coating waterproof layer is completed and accepted, the protective insulation layer should be designed according to the design requirements.

Copyright Copyright (C) 2009-2010 Shenzhen Jinke Panther waterproof material limited record number: Guangdong ICP No. 14071950 -2


技术支持:迅博威
Frendlink : | | | | | | | | |